Skip to content
Luxury hotel lobby interior
Hotel & Hospitality Furniture

Hotel Furniture Manufacturer Turkey

Turnkey FF&E Solutions

Hotel furniture Turkey production from lobby to suites, restaurant to spa. Turnkey FF&E manufacturing from Modoko, Istanbul with Grand Soho Hotel New York, Katara Hills Hilton Qatar, and private villa references across multiple countries.

Request Consultation
ISO 9001:2015 certified
Manufacturing since 1981
Own factory, Modoko Istanbul
Worldwide export: USA, Gulf, Europe
Services

Service Areas

Custom hotel furniture manufacturing for every area of your hotel.

Lobby Furniture
01

Lobby Furniture

Reception desks, seating groups, and decorative elements that define the first impression.

Room Furniture
02

Room Furniture

Headboards, nightstands, minibar units, wardrobe systems, and writing desks.

Restaurant & Bar
03

Restaurant & Bar

Dining furniture, bar counters, coffee tables, and seating arrangements.

Conference & Meeting
04

Conference & Meeting

Meeting tables, conference seating, platforms, and stage furniture.

Spa & Wellness
05

Spa & Wellness

Relaxation loungers, massage room furniture, changing lockers, and lounge areas.

Process

Our Process

Professional project management from concept to delivery and installation.

01

Consultation

Project scope definition, needs analysis, and budget planning.

02

Design

3D modeling, material selection, color palette, and prototype approval process.

03

Production

Manufacturing at our Istanbul facility under quality control, serial or custom.

04

Delivery & Installation

Professional packaging, logistics, and on-site assembly teams for turnkey delivery.

Materials

Contract-Grade Materials

100,000+ Martindale, fire-retardant foam options on request, tested for 10+ years of daily hospitality use.

Hotel furniture production line, material craftsmanship

Commercial-Grade Fabrics

High-traffic durable, easy-clean, stain-resistant upholstery fabrics.

Fire-Retardant Foams

Fire-retardant filling material options compliant with international fire safety standards, available on request.

High-Traffic Upholstery

Seating and sofa upholstery with 100,000+ Martindale abrasion resistance for long life.

Specialty Finishes

Scratch-resistant lacquer, natural wood veneer, and metal accessory options.

FF&E

FF&E Procurement Process

Complete furniture, fixtures & equipment coordination from a single source.

What FF&E Covers

Furniture, Fixtures & Equipment, every moveable item: beds, sofas, desks, chairs, lighting, curtains, carpets, decorative elements. We manufacture furniture in-house and coordinate fixtures through trusted partners.

Lead Times

8-16 weeks depending on scope. 100-room hotel: ~12 weeks from design approval. Rush orders (50 rooms or less): 6-8 weeks. Sampling phase: 2-3 weeks.

Shipping Terms

FOB Istanbul, CIF, or DDP, worldwide delivery. Container loading supervision, professional packing, installation team available on-site.

What does FF&E procurement include?

FF&E covers all moveable items in a hotel: beds, sofas, desks, chairs, lighting fixtures, curtains, carpets, and decorative elements. Archidecors manufactures custom furniture in-house and coordinates fixtures and equipment through trusted partner networks.

What is the lead time for hotel FF&E projects?

Typical lead times range from 8-16 weeks depending on project scope. A 100-room hotel takes approximately 12 weeks from design approval to delivery. Rush orders for 50 rooms or less can be completed in 6-8 weeks.

Do you ship FF&E internationally?

Yes. We deliver FF&E projects worldwide. Recent projects include Grand Soho Hotel in New York City and Katara Hills Hilton in Doha, Qatar. We handle FOB Istanbul, CIF, or DDP shipping terms.

Workflow

How an FF&E Project Runs With a Manufacturer

The actual procurement workflow, model-room-first, so a single guestroom is signed off before a single container is built.

01

Model Room Build

We build one complete prototype guestroom (or a full lobby vignette) to the approved drawings before batch production. The operator and designer physically inspect finish, comfort, dimensions, and fabric in person. This is where spec gaps surface, not after 100 rooms are made.

02

Operator Sign-Off

The brand standard team (Hilton, Marriott, IHG, Accor, Hyatt) and the project designer formally approve the model room. We log the signed-off specification as the single production reference. Any later change is a documented variation, not a surprise.

03

Batch Production

Once the model room is locked, we run the full quantity in our Modoko, Istanbul facility against the frozen spec. In-house upholstery, casegoods, and finishing keep every unit identical to the approved sample.

04

Pre-Shipment QC

Each batch is checked against the approved model room: dimensions, finish match, hardware function (soft-close, drawer glides), fabric lot consistency, and fire-test documentation for the relevant standard. Buyer or third-party (SGS/Bureau Veritas-style) inspection can join before loading.

05

Container Loading

We supervise loading personally, room-by-room or area-by-area packing maps, export-grade crating and corner protection, photographed load plans, and a packing list keyed to your install sequence so the site team unloads in the right order.

06

On-Site Install

Our own or partnered install crew assembles and places on site, with snag-list resolution. For US and Gulf projects we coordinate with the GC and local labor on timing, freight elevators, and protection of finished areas.

Scope Matrix

Scope by Hotel Area

What we manufacture in-house versus what we coordinate, area by area, so there is no grey zone in your FF&E matrix.

Lobby & Reception

Manufactured in-house

Reception desks, lounge seating, banquettes, occasional and coffee tables, decorative casegoods, bookmatched veneer and stone counters.

Coordinated for you

Decorative lighting, area rugs, artwork, planters.

Guestroom & Suite

Manufactured in-house

Headboards, beds and bases, nightstands, wardrobes, minibar and TV units, writing desks, luggage benches, lounge and desk chairs.

Coordinated for you

Mattresses, lighting, curtains and hardware, carpet, in-room textiles.

F&B / Restaurant & Bar

Manufactured in-house

Dining chairs and tables, booth and banquette seating, bar and host stands, service stations, bar fronts.

Coordinated for you

Tabletop items, bar smallwares, kitchen equipment (OS&E).

Spa & Wellness

Manufactured in-house

Relaxation loungers, reception and retail joinery, treatment-room casegoods, changing lockers, lounge seating.

Coordinated for you

Treatment tables, wet-area fixtures, specialist equipment.

Back-of-House

Manufactured in-house

Staff casegoods, durable seating, custom storage and joinery where specified.

Coordinated for you

Catering equipment, lockers, operational racking.

Certification

5-Star Hotel FF&E Standards

The standards international operators require on their approved-supplier lists; compliant fabrics and test reports available on request.

CAL 117 (US Market)

California Bureau of Home Furnishings fire test. Marriott, Hilton, Hyatt operator supplier-list requirement. Pass-through testing for cushion fillings and flame-retardant upholstery fabrics.

BS 5852 (UK + EU)

British Standards Match Test and Crib 5 ignition tests. IHG, Accor, Premier Inn operator approved-list requirement. Cigarette test, match test, and crib 5, three-level certification.

IMO FTP Code (marine + cruise)

International Maritime Organization Fire Test Procedure. Mandatory for yacht-hotel, marina-club, and cruise hospitality projects. Toxic emission, flame spread, and smoke opacity testing.

100,000+ Martindale (contract-grade)

High-traffic seating and upholstery abrasion benchmark. 25K residential, 50K light contract, 100K+ heavy contract (hotel lobby, restaurant). Our fabrics typically pass 120-180K test cycles.

ISO 9001 + FIRA testing

ISO 9001 production quality management system, plus FIRA-tested components available on request. Project test-set reports archived per batch and provided to hospitality buyers on request.

Budget Bands

Per-Room FF&E Budget 2026

Typical bands by operator brand, room size, and material class.

Standard Room ($8K-15K)

4-star and mid-tier 5-star room. Contract-grade headboard, nightstand pair, wardrobe system, writing desk, minibar unit, ergonomic chair, curtains and rugs included. Typical for 25-32 m² rooms.

Junior Suite ($15K-25K)

5-star hotel junior/executive suite. Extended headboard, seating group (2-3 seater sofa + coffee table), dressing area, desk, minibar, curtains-rugs package. 40-55 m² area.

Presidential Suite ($25K-50K+)

Ultra-luxury operator (Hilton LXR, Ritz-Carlton, Mandarin Oriental) presidential suite. Designer co-branding, marble island bar, walk-in dressing, lounge set, dining table. 80-150 m² area.

Lobby & Public Area ($150K-500K)

Reception desk (Calacatta marble or bookmatched veneer), seating groups (3-5 sets), bar counter, decorative elements. The "face" of the hotel, typically 12-18% of total budget.

Technical Details

Niche Technical Details in Hotel Furniture

Technical line items that frequently appear in operator spec sheets.

Tufted Headboard & Banquette

Classic tufted headboard with 8 cm high-density foam core + 100K+ Martindale fabric + flame-retardant impregnation. Banquette (long bench) lobby and restaurant use shares same construction with metal foot reinforcement.

Contract-Grade Beech Solid

Lobby chair frames in European beech solid (16-22 mm), 8-10 year heavy-use guarantee. Channel-joinery + adhesive + dowel combination prevents twist, crack, or loosening.

Bookmatched Walnut & Brass Inlay

Reception desks and presidential suite panel walls in bookmatched (mirror-matched) natural wood veneer. Brass inlay details (1-3 mm high-purity brass) feature in Art Deco hospitality design.

Carrara/Calacatta Lobby Stone

Calacatta Marble or Calacatta Borghini dense-veining preferred for lobby counters and restaurant tables; Carrara Bianco fits minimalist palettes. Quartz alternatives (Caesarstone) common in bathroom counters for maintenance.

Soft-Close Minibar Doors

Blum or Hettich soft-close hinges for minibar doors, guest noise experience. Thermoelectric or semi-active cooler with insulated plastic interior shell + wood exterior cladding combination.

Layered Blackout Curtain System

Premium hotel uses 3-layer curtain: daylight sheer + decorative fabric + blackout (light-blocking lining). Motorized rod + smart room integration (KNX, Crestron) optional per operator standard.

Checklist

Hotel FF&E Supplier Selection Criteria

8 control points in operator supplier-approval flow.

  • 1ISO 9001 production quality management system certification
  • 2CAL 117 + BS 5852 fire test certificates (per batch)
  • 3FIRA test reports (Furniture Industry Research Association)
  • 4In-house production ratio (outsourcing >25% = risk signal)
  • 5Material transparency (fabric supplier, foam source, wood origin)
  • 6Lead time commitment + penalty clauses (delay = daily 0.1-0.3%)
  • 7Sampling process (2-3 weeks) + revision capacity (3-5 rounds)
  • 8On-site installation team availability (own vs partner)
Export & Logistics

Export & Logistics for Overseas Hotels

How a Turkish-made FF&E order reaches a hotel site in the USA, the Gulf, or Europe.

Incoterms We Work On

FOB Istanbul (you control the ocean leg and import), CIF (we cover freight and insurance to your destination port), or DDP (we deliver duty-paid to site, simplest for buyers without a local import setup). We size the right term to your team and budget per project.

Documentation Pack

Commercial invoice, packing list keyed to the install sequence, certificate of origin, fumigation/ISPM-15 heat-treated pallet certificates, bill of lading, and project fire-test reports for the relevant standard. Clean paperwork is what keeps a container out of customs hold.

Typical Sea-Freight Transit

Indicative ocean transit from Istanbul: roughly 2-3 weeks to US East Coast, 3-5 weeks to US West Coast, about 2 weeks to the Gulf (Doha, Dubai), and 1-2 weeks to most Mediterranean and Northern European ports. Transit is in addition to production lead time and varies with carrier schedule and season.

Loading Supervised, Not Outsourced

We do not hand cargo to a third party and walk away. Loading is supervised in-house with photographed load plans and room-by-room maps, so what leaves the factory is documented and matches what your site team expects to unload.

Manufacturer vs Trader

Why Buy From the Manufacturer, Not a Trading Company

On an FF&E project, the difference between a factory and a middleman shows up in accountability.

One Accountable Party

When the maker is the seller, there is no finger-pointing between a trader and an unnamed sub-factory if a finish is off or a date slips. The model room you approved and the units you receive come from the same floor.

Direct Spec Control

A trading company relays your spec to a factory it does not own; detail gets lost in translation. We hold the drawings, run the line, and answer to you directly, so a fabric, foam density, or joinery change is made at source, not negotiated through a layer.

Honest Material Transparency

We name the fabric, foam source, and wood origin, and we source CAL 117 / Crib 5-compliant fabrics on request with lot-level fire test reports. A reseller often cannot tell you what is actually inside the cushion.

No Hidden Margin Stack

Buying direct from a 1981 factory removes the trader markup layered on top of the real production cost. Your budget buys furniture, not a chain of intermediaries.

FF&E Consultation

Share your project scope. We'll respond from our Modoko production facility within 24 hours.

Request a Consultation

Tell us about your project, we respond within 24 hours.

45 Years ExperienceCustom ProductionFree Consultation

Get a quote for your project

Get Quote