Istanbul Factory Since 1981 · Upholstery, Joinery and Casegoods
Hotel Renovation Furniture
Refresh the Rooms, Keep the Hotel Open
A soft refurbishment changes how a room feels without rebuilding it: new upholstery, a new headboard wall, refreshed casegoods. We produce all three in one factory and install them floor by floor, so the rooms you are not working on keep selling.
Scope
What a Hotel Soft Refurbishment Covers
Guest reviews rarely mention the building. They mention a tired sofa, a stained headboard, a scratched desk. Those are exactly the pieces a soft refurbishment replaces, and they are the pieces we make.
Re-upholstery
Guest room sofas, armchairs and lobby seating re-covered with new foam and contract-grade fabric where the frames are sound. The fastest visible change per room.
Upholstered Headboard Walls
A full-width upholstered or veneered headboard wall replaces a single headboard and resets the whole room, with bedside shelves and reading-light cut-outs planned in.
Casegoods Refresh
Desks, wardrobes, TV and minibar units re-veneered or rebuilt to the same footprint, so electrical points and room layout stay where they are.
Restaurant and Lobby Seating
Banquettes, booths and lounge seating for the public areas, produced in the same run so the finishes match the rooms.
Carpets, curtains and lighting are procured by the fit-out contractor or FF&E agent on the project. We coordinate our dimensions and installation dates with them, so the room comes together on one schedule.
Phased Floor by Floor, Starting With a Mock-Up Room
- Site survey and room inventory. We measure every room type, note which frames can be re-upholstered and which pieces are replaced, and list quantities per floor.
- Mock-up room. One room is produced and installed first, with fabric, veneer and finish samples signed off before the main run.
- Batch production in Istanbul. Batches follow the floor or wing sequence agreed with your operator, produced in our own factory under ISO 9001:2015 quality management.
- Installation per floor. Each batch is delivered and installed while the rest of the hotel keeps operating. Export documentation is handled in-house on FOB, CIF or DDP terms.

Where We Work
Istanbul and Turkey: the shortest route, with our own team on site for survey and installation.
Saudi Arabia and the Gulf: we usually supply through the fit-out contractor or FF&E agent appointed on the project and phase deliveries to their programme.
United Kingdom, Ireland and Europe: furniture moves between Turkey and the EU without customs duty under the customs union; for the UK we supply the origin documentation your broker needs.
References
We describe every reference exactly as supplied, with no wider scope claims.
Qatar
Katara Hills
Villa furniture for Katara Hills. A villa and loose furniture reference.
United States
Loose furniture supply for a New York hotel, described strictly as loose furniture supply.
United Arab Emirates
District One, Dubai
Furniture fit-out for a residential project in District One.
Frequently Asked Questions
Can the hotel stay open during the furniture renovation?
Yes, that is how we plan it. Rooms are grouped by floor or wing, production runs in batches that match those groups, and each group is installed while the rest of the hotel keeps selling. The first batch is preceded by a mock-up room that you approve before the main run.
Do you re-upholster existing furniture or replace it?
Both, decided piece by piece after the site survey. Where frames are sound, re-upholstery with new foam and fabric is usually the better value; where they are not, we produce new pieces to the same footprint so the room layout does not change. Headboards are often replaced with a full upholstered headboard wall, which changes the room more than any single piece.
What does your scope cover, and what does it not?
We cover furniture, fixed joinery and upholstery: seating, beds and headboards, headboard walls, desks, wardrobes, TV and minibar units, and restaurant or lobby banquettes. Carpets, curtains and lighting are procured by the fit-out contractor or FF&E agent on the project, and we coordinate our dimensions and installation schedule with them.
Which fabrics do you use for hotel re-upholstery?
Contract-grade fabrics selected for the destination market, including fire-rated options where the project requires them, supplied with the fabric manufacturer's test reports. Our own company certification is ISO 9001:2015 quality management.
Do you work on hotel renovations in Saudi Arabia and the Gulf?
Yes. In Saudi Arabia and the wider Gulf we usually supply through the fit-out contractor or FF&E agent appointed on the project, with export documentation handled in-house and delivery phased to their programme. Our Gulf reference is villa furniture for Katara Hills in Qatar.
How long does a hotel renovation furniture package take?
The schedule is set per project once the scope is fixed, because room count, batch size and finish level change it. The mock-up room comes first; once it is approved, batches follow the floor sequence you set with your operator.
Plan Your Hotel Renovation
Send the room count per type, photos of the current rooms and your target reopening sequence. We return a piece-by-piece approach (re-upholster or replace), a mock-up proposal and a current quote.